# Engineering Change Order

Skill · Manufacturing and Industrial

Canonical page: https://career.thegoodapps.co/skills/engineering-change-order

An Engineering Change Order (ECO) is a formal document used to propose, review, and authorize a modification to a product's design, drawings, or specifications after initial release. Used heavily in manufacturing and product development, it tracks the reason for the change, its impact on cost and schedule, and required approvals before implementation.

Related skills: [Configuration Management](https://career.thegoodapps.co/skills/configuration-management), [Document Control](https://career.thegoodapps.co/skills/document-control), [Change Management](https://career.thegoodapps.co/skills/change-management), [Quality Assurance](https://career.thegoodapps.co/skills/quality-assurance)

## Open roles requiring Engineering Change Order (0)

None of the roles we have read name this skill yet. A large share of the visible corpus has not been parsed for skills, so this is at least as likely to be our backlog as the market's verdict.
